News

DeRun Energy Co.,Ltd

Address: Room 2101, Building 1, No. 6 Shuguang Xili, Chaoyang Dist., Beijing , P.R.China.
Postal code: 100028
Tel: +86 10 58677866
Fax: +86 10 58677866
Email: sales@luhaienergy.com
Download DeRun Brochure

What Are Follow-up Maintenance Work of Sewage Dewatering Centrifuge?

For the follow - up maintenance work of sewage dewatering centrifuge, there are several precautions.
1.Sewage centrifuge has the ability of nitrogen and phosphorus removal, can adjust the structure of equipment to achieve the treatment of industrial waste water, domestic sewage, urban sewage.
2.Contact oxidation tank mostly combined soft filler, high surface area, high biofilm adhesion, high contact efficiency between sewage and biofilm.
3.The effluent water quality is stable, the sludge output is less and easy to handle.
4.Submersible pumps can be located in the equipment, to reduce the project investment;
5.Sewage sludge decanters can be installed on the ground, can also be buried underground. Buried in the ground, the upper cover can be used for green. 

Sludge/Sewage Dewatering Decanter Centrifuge